LIFT ACCESSORIES · CABLE SELECTION
RVV cable
10 m+ listing
The original entry describes a machine-room-to-pit cable with a “10 m+” starting-length label. Confirm specification against the actual location, required length and equipment interfaces.

Start with location and required length
Define the site requirement, then check the cable marking and corresponding specification.
Use location
Describe the actual machine-room and pit locations.
Required length
“10 m+” is the listing’s starting length, not a maximum transmission distance.
Read the title
alongside the image.
The title and image both name machine room to pit. Confirm the exact specification and required length.
Title location
Machine room → pit
Image location
Machine room → pit
Image specification marking
RVV 2*0.75
“10 m+” is the listing’s starting length. Confirm the order length against the requirement.
CONFIGURATION & PARAMETERS
Retain the markings; confirm the specification
The original “2*0.75” notation is retained. Confirm core count, cross-section units and other electrical properties against the cable specification.
- Type marking
- RVV
- Original image marking
- RVV 2*0.75
- Original title location
- Machine room to pit
- Original image location
- Machine room to pit
- Length label
- 10 m+ starting length
Confirm against a cable requirements list
Endpoints
Provide the actual endpoints, equipment names and existing connector photos.
Length and specification
Provide the required length and existing cable markings or specification sheet.
Installation conditions
Describe the installation arrangement and environment, then check suitability against the specification.
MODEL & SITE FIT
Confirm location, length and cable specification
Bring the actual endpoints, required length, existing cable markings and equipment interface documentation.