Third-party integration
Third-party integration requirements · V2.3
Check interface requirements by system type, with equipment records, data points and integration questions in one place.
For integration engineers, equipment and system suppliers, and project staff coordinating interfaces.
The original file is in Chinese. If preview is unavailable, download it and open it in a compatible reader.
Read the usage guide
Usage guide
Identify the systems, then check interfaces
Find the relevant systems
The document is organized by systems such as building automation, lighting, access, parking and energy. List your equipment, suppliers, models and software versions before reading the relevant sections.
- Have ready
- Equipment and system inventory, supplier interface documents and network conditions.
Check data and permissions
Compare V2.3 with supplier documentation for protocols, point meanings, units, sampling and read/write permissions. List missing or unconfirmed interfaces for follow-up.
- Confirm
- Who supplies the data, how it can be read and which operations are authorized.
Define adaptation and testing
Confirm that the document matches the installed system versions. Discuss adapters, deployment networks, a test environment and acceptance scenarios, with supplier responsibilities recorded.
- Work toward
- A list of available interfaces, missing information and integration test arrangements for joint review.
Discuss your integration conditions
Bring equipment models, system versions, interface documents and open questions. Describe the data to bring together and the business workflow it should support.